Filming Schedule- For Re-filming

Time
What is happening?
4.00pm
Make sure all of the props are collected together ready for filming 
4.10pm
Meet Alex in Stapleford
4.15pm
Walk to the location
4.20pm
Set up equipment and get the actors in place ready for filming
4.30am
Begin filming
4.45pm
Set up in other location on the field
5.00pm
Finish filming on the field
5.10pm
Move locations to the canal
5.30pm
Film on the canal
5.45pm
Check through each shot, to make sure we have got all the shots we need
6.00pm
Dismantle equipment
6.15pm
Walk home with the equipment



12/03/2011   
Before filming, I thought it would be appropriate to set a timetable for the day so we could each see what we needed to film and what time. Although it will be hard to stick to the timetable, it will give us some indication and guidelines of what is being done throughout the day. I have given a significant amount of time for everything to be filmed as we may need longer on some particular parts, but this will be changed throughout the day.