Sunday, 20 February 2011

Filming timetable

Time
What is happening?
10am
Make sure all of the props are collected together ready for filming tomorrow
10.30am
Meet Emmie, Casey and Thomas in Stapleford
11.00am
Walk to the location
11.15am
Set up equipment and get the actors in place ready for filming
11.30am
Begin filming
12.00pm
Set up in other location, on the bridge
12.30pm
Finish filming on the bridge
1.00pm
Move locations to the canal
1.30pm
Film on the canal
2.00pm
Check through each shot, to make sure we have got all the shots we need
2.30pm
Dismantle equipment
2.45pm
Walk home with the equipment


20/02/2011   
Before filming, I thought it would be appropriate to set a timetable for the day so we could each see what we needed to film and what time. Although it will be hard to stick to the timetable, it will give us some indication and guidelines of what is being done throughout the day. I have given a significant amount of time for everything to be filmed as we may need longer on some particular parts, but this will be changed throughout the day.
  